TEL:+86(580)2038333
House
Current Location:Home>Others
Remind: your computer time is not consistent with the auction time.please bid early and not miss the best bid time.
 
5331 On-look 0 Followed
Auction of Gaochun Scrapped Vessel
Auction ending information
   
Start:
2017-08-17 10:00
End:
2017-08-17 12:00
Total bid:
31 times
End price:
9800000 RMB
Top bidder:
658
Ending type:
sold
Start price:¥6,500,000 RMB
Bid Increment:¥50,000 RMB
Seposit:¥700,000 RMB
Type: Others
Preemptive person:No
Online consultation
Appraise price:Empty
Bidding cycle:2 hours
Postpone:5 minutes/time
Reserve price:Yes
Bid history
State Bidder Price(RMB)
658 ¥9,800,000
319¥9,700,000
759¥9,600,000
736¥9,550,000
938¥9,500,000
658¥9,450,000
937¥9,400,000
669¥9,350,000
053¥9,300,000
658¥9,250,000
details
Ship name
Gaochun
Type of vessel Dry Cargo Ship
Entrust institution ZHEJIANG SHIPPING EXCHANGE Reference price(RMB) 6500000
State of the auction First auction Auction date 2017-08-17
Ship's classification ZC Length overall(m) 158.67
Port of registry Length(m) 146.80
Molded breadth(m) 22.80 Molded depth(m) 13.20
Gross tonnage 12084.00 Reference
deadweight(t)
15000.00
Type of main engine MAN 8KSZ 52/105CLE Total fixed power
(KW / h)
6002.00
Shipyard Romania Completion date 1989-07-30
Reconstruction
shipyard
Reconstruction
completion date
Anouncement
Notice
Additional
Technical
Information
Bid history(31)
Anouncement

Bidding Announcement of Gaochun Scrapped Vessel

Entrusted by the transferor, we decide to hold a public auction in the auction hall of the Zhejiang Ship Exchange Market at 10:00 a.m. on August 17, 2017.

 1. Auction Object: Gaochun Dry Cargo Ship

Length Overall: 158.67m; Molded Breadth: 22.80m; Molded Depth: 13.20m; Gross Tonnages: 12084; Nett Tonnages: 6767; Reference Deadweight: 15000t; Total Fixed Power: 6002KW/h; Completion: July, 1989 Romania. (The above data is for reference only. You can see the object details on www.csi.com.cn oother materials provided at the time of registration.) 

2. Reference Starting Price: 6.5 million yuan, deposit0.7 million yuan. Please transfer the deposit and payment of the ship to the following account:

Account name: Zhejiang Ship Exchange Market Co. Ltd Account number: 3309040160000036844

Bank name: Bank of Hangzhou, Zhoushan Branch

3. Qualification Requirements: The bidder must be in the "List of Companies of Old Transport Ship and Single-hull Tanker Dismantling" which the Ministry of Transport announced on December 10, 2013 and July 3, 2014. At the same time the relating facilities and access to the port waterway conditions of the dismantling enterprise must meet the "Gaochun" dismantling requirements.

4. Registration and Viewing Date: from now on to 16:00 on August 16, 2017Interested bidder can bring your valid identification to the 6F of the Bulk Commodity Exchange Center, Wengshan Road No. 555, Lincheng District, Zhoushan, Zhejiang Province to register. (Except holidays.) Viewing Date:From now on to August 16, 2017; Viewing Location: Dayushan Island, Zhoushan.

5.Transfer method: When the application reaches two (including two) or more then it comes to the public auction. When there is only one application, then it comes to bid transfer.

6. Auctioneer: Zhoushan Eagle Ship Bidding Co.Ltd

7. Contact number and contact person: 0580-2027516, 2039777, Ms. Ye & Mr. Wang

Zhejiang Ship Exchange Market Co. Ltd

August 9, 2017

Notice

BIDDING RULES 

 

Article 1 Bidding Rules is made by relevant lawsregulations and policies of our Country and with Shipbid practical situations, to standardize the bidding behaviors, maintain an open, fair and equal transaction order, and protect legitimate rights and interests for all the parties involved.

 

Article 2 The Transaction Rules of the ship bidding (hereafter to be referred as bidding) is suitable for standardizing all the online bidding behaviors. All the parties involved should abide by the Rules and bear legal responsibilities for their own behaviors.

 

Article 3 All legal personalities, natural persons and other organizations in and abroad PRC can participate in the bidding only if they have the qualifications of the auction announcement except those provided by laws and regulations.

 

Article 4 The auction announcement and other documents are formulated by the auctioneer. 

 

Article 5 The auction information including videospictures and written introductions offered by the Seller will be uploaded through the Shipbid system after verified by the auctioneer.

 

Article 6 The Seller shall take all the legal responsibilities and economic losses if he provides with fake information.

 

Article 7 The bidders couldn’t participate in the bidding activities until they register as the buyers through the Shipbid system.   

The passwords should be kept safely. If forgotten, bidders could retrieve through the Shipbid system. And idivulgedbidders should login in time to change the passwords.

 

Article 8 Before submitting the application for the biddingthe bidders should carefully read the auction announcement, ship’s information, transaction rules and other relevant documents, then login the Shipbid system to fill in true and effective information as required.

 

Article 9 The bidders should submit the applications in accordance with the auction announcement before the Shipbid starts.

If legal personalities, natural persons and other organizations need joint-biddingthey should fill in related information and the proportion of capital contribution of each party as required and sign the Joint Bidding Statement.

 

Article 10 The bidders apply on the Shipbid system by themselves, and pay the deposit either on line or offline. Foreign bidders could also apply for bidding with the Guarantee Letter of bank as the auctioneer requiredOne deposit is only for one lot. And if the bidders want to bid several ships at the same timecorresponding deposits are required.

The bidders are entitled to bid only if the deposit fully paid to the nominated account (based on the arrival time of the deposit) or the original Letter of Guarantee delivered to the auctioneer (based on the arrival time of the Letter of Guarantee to persons in chargewithin the required timeThe bidders shall not be eligible for bidding if the deposit is delayed or not fully paid or the Letter of Guarantee is not received on time.

 

Article 11 The bidding shall be conducted with time limit. Qualified bidders can participate in the bidding. The initial offer shall not be lower than the starting price and each offer shall be no less than the specified bid increment.

If it is an auction with reserve priceYES” will be revealed in the system. Otherwise it will display “NULL.

 

Article 12 The bidder shall make a cautious bid, and the offer will be irrevocable once submitted.

 

Article 13 The last limited time of the Shipbid is FIVE (5) minutes. If there is a new bid within 5 minutes countdown, another 5 minutes will be set.

No new offers would be accepted after the final countdown, and the bidding history will be revealed.

 

Article 14 Once there is/are (a) bidder offer(s) in the Shipbid, the target bidder (hereinafter called the Buyer) shall be confirmed in accordance with the following rules 

(1) Where there is no reserve price, the highest bidder would be the Buyer.

(2)Where there is a reserve price, the bidder with the highest offer and not lower than the reserve price would be the Buyer; If the highest offer is lower than the reserve price, the bidding will be pass.

When the time for the bidding is over, the bidding system will be automatically closed.

 

Article 15 The Buyer should confirm his qualification with the enterprise or individual valid certification to the auctioneer within 3 working days after the biddingAfter verification and confirmation, the Buyer should sign the Purchase Confirmation.

If the Buyer's qualification is not approved, the bidding result will be invalidthe deposit would be confiscated, and the lot should be bid again. The Buyer should pay the commissions for both parties due to his breach of the contract; Also, the previous Buyer should pay the balance of price if the final purchase price is lower than the first purchase one.

 

Article 16 The payment of balance shall be remitted to the nominated account in time according to the Purchase Confirmation.

 

Article 17 The Buyer should sign the Sale and Purchase Agreement by the Purchase Confirmation with the seller within the required time and make relevant transaction procedures.

 

Article 18 The auctioneer should publicize the bidding results through the Shipbid system after the bidding.

 

Article 19 After paying the balance, the Buyer himself should handover the lot and manage the transaction procedures in time. If the Buyer fails to manage within required time, he himself should pay the costs caused by the delay and afford the consequences of possible damage or losses.

 

Article 20 The Buyer himself should register the lot and bear all relevant expenses occurred according to the regulations and policies during the transaction procedures.

 

Article 21 The bidding currency is RMB. Both the starting price and purchase price do not include the expenses and taxes occurred during transaction procedures.

 

Article 22 If the bidder obstruct others to bid, manipulate or monopoly the bidding price, or make malicious collusion, the auction will be cancelled once above behaviors are found, and relevant legal responsibility will be borne by the bidder. 

 

Article 23 If the bidder cannot normally login the Shipbid system to applyoffer or bid because of following reasons such as virus invasion, hardware failure, network congestion or passwords forgotten and divulge, etc., he himself should bear the consequences and the bidding will not be suspended.

 

Article 24 The auctioneer has the right to suspend or withdraw the bidding before it starts according to the laws and regulations.

 

The time concerned in the bidding all depends on Shipbid system service time, except the deposit arriving time which depending on the bank recording time. All the time of information arriving is subject to the time when the information received by Shipbid.

Zhejiang Shipping Exchange Co Ltd is responsible for the interpretation of the Rules


Additional
No content yet
Technical


Information
No content yet
Bid history
State Bidder Price(RMB) Time
658
¥9,800,000 2017-08-17 11:02:40
319
¥9,700,0002017-08-17 10:59:43
759
¥9,600,0002017-08-17 10:57:36
736
¥9,550,0002017-08-17 10:55:20
938
¥9,500,0002017-08-17 10:54:00
658
¥9,450,0002017-08-17 10:52:58
937
¥9,400,0002017-08-17 10:50:33
669
¥9,350,0002017-08-17 10:49:10
053
¥9,300,0002017-08-17 10:46:33
658
¥9,250,0002017-08-17 10:45:11
203
¥9,200,0002017-08-17 10:42:20
759
¥9,000,0002017-08-17 10:40:31
203
¥7,400,0002017-08-17 10:38:54
053
¥7,350,0002017-08-17 10:36:36
902
¥7,300,0002017-08-17 10:33:57
938
¥7,250,0002017-08-17 10:31:41
759
¥7,200,0002017-08-17 10:29:41
133
¥7,150,0002017-08-17 10:27:16
053
¥7,100,0002017-08-17 10:24:53
771
¥7,050,0002017-08-17 10:21:56
319
¥7,000,0002017-08-17 10:19:34
669
¥6,950,0002017-08-17 10:18:06
319
¥6,900,0002017-08-17 10:16:50
053
¥6,850,0002017-08-17 10:14:33
803
¥6,800,0002017-08-17 10:12:43
736
¥6,750,0002017-08-17 10:11:16
902
¥6,700,0002017-08-17 10:08:36
771
¥6,650,0002017-08-17 10:05:53
133
¥6,600,0002017-08-17 10:04:28
053
¥6,550,0002017-08-17 10:03:19
759
¥6,500,0002017-08-17 10:01:51
Disclaimer:
The online ship auction doesn't declare or guarantee the correctness or reliability of any information published on the website;The risk caused that you accept and acknowledge this information shall be borne by yourself. The online ship auction has the right but not obligation to improve or correct any errors ormisunderstandings on any part of the information published.
 
 
 
- 福彩双色球开奖时间
Home??|??Judicial??|??State-owned??|??Others??|??Auction Announcement
TEL:+86(580)2038333;FAX:+86(580)2027516
QQ service online:869376802福彩双色球开奖时间
浙ICP備11020397-3號